IQF Okra Line: 3.2 tons/hr with Two-Stage Crust-Freeze™ System for Badafi Foods

High-capacity individually quick-frozen poultry line with NH₃ refrigeration. Fully automated from infeed to packaging interface. Operational since Q3 2024.

Project Overview

Background & Requirements

Badafi Foods, a Texas-based vegetable processor, needed a high-capacity IQF line for okra and other vegetables. The critical challenge: okra harvested by 8 AM must be cleaned, blanched, cut, and IQF-frozen within a 40-minute window to prevent quality degradation. Their “field-to-plate-in-a-day” promise required a freezer that could handle peak harvest volumes with zero downtime and near-zero clumping.

Client Badafi Foods
Facility McAllen, Texas, USA
Food product IQF frozen okra (and other vegetables)
Peak throughput 3,200 kg/hr
Crust-freeze temperature -40°C (Stage 1) / -30°C (Stage 2)
Core outlet temperature -18°C
Refrigerant NH₃ (ammonia)
Operational since 2024

System Configuration

Equipment & Square's Patented Technologies

Custom IQF spiral freezer with three patented Square Technology innovations — designed and manufactured at our Nantong campus, installed by our 200-person global installation team.

  • Two-Stage Crust-Freeze™ System

    Patented dual-zone IQF spiral

    Stage 1: High-velocity air at -40°C forms ice crust within 90 seconds per piece, preventing clumping and locking in nutrients. Stage 2: Gentler belt-conveyed freezing to solidify interiors to -18°C core. Variable-speed fan control per zone.

  • Zero-Downtime AirJet Defrost

    Patented compressed-air pulse system

    Compressed air pulses clear evaporator ice every 30 minutes during operation — eliminating production stoppages for manual defrosting. Enables 24/7 production during 18-hour harvest windows.

  • Hygienic Quick-Clean Architecture

    NSF-certified stainless steel

    Tool-free hatch access to all product-contact surfaces. Sloped floors with central drainage. Automated CIP skid with programmable wash cycles. Sanitation time reduced from 90 minutes to 25 minutes per cycle.

  • Refrigeration System

    NH₃ Pump-Recirculated

    Self-developed evaporator lines. In-house foaming for plate freezer insulation. Custom fin spacing and coil geometry. Ammonia pump-recirculated system with evaporative condenser. Two-stage compression optimized for low-temperature operation. Automatic oil return and non-condensable gas purging.

  • Control System

    NH₃ Pump-Recirculated

    Siemens PLC with HMI touchscreen. Real-time monitoring of belt speed, fan RPM, evaporator temperature, and product core temp. Remote diagnostics via VPN. Recipe storage for multiple vegetable types.

  • Infeed & Outfeed Integration

    Vibratory spreader + take-away

    Vibratory infeed spreader ensures even single-layer product distribution. Take-away conveyor synchronized with downstream weighing and packaging. All conveyors IP66 rated for full washdown.

Performance Data

Measured Results — First Harvest Season

Performance data collected during the 2024 okra harvest season. All figures verified against commissioning report and customer production logs.

  • 0

    kg/hr Sustained

    Peak throughput (20% above previous equipment)

  • 0%

    Separation Rate

    Individual particle separation (vs 94% industry average)

  • $0

    Per Month

    Peak throughput (20% above previous equipment)

  • 0 %

    Higher

    Vitamin retention vs competitors’ tunnel freezers

  • 0

    min/cycle

    CIP sanitation time (down from 90 min)

  • 0/7

    Operation

    Non-stop production during harvest windows

Client testimonial: "Square's freezer became our freshness time capsule — locking in farm nutrients at 6 AM for dinners at 6 PM."

— Badafi Production Director

Engineering note: The Crust-Freeze system's 90-second surface freeze is the key performance driver. By forming an impermeable ice shell before significant sublimation can occur, dehydration loss is kept below 0.5%. The AirJet Defrost system eliminates the need for 3–4 daily production stoppages — recovering approximately 2.5 hours of production time per day during peak harvest.

Installation & Commissioning

On-Site Build by Our 200-Person Installation Team

Full installation handled by Square Technology’s dedicated construction crew — not subcontracted to local contractors with remote engineering supervision.

Foundation work, equipment plinths, drainage, NH₃ containment. 12 days.

Spiral freezer assembly, conveyor integration, refrigeration piping, CIP skid. 18 days.

Power distribution, PLC cabinet, sensor network, HMI, remote monitoring. 8 days.

NH₃ charge, system balancing, test runs with okra, performance verification. 6 days.

Operator training, maintenance SOPs, spare parts setup, documentation. 4 days.