Which Freezing Technology Fits Your Product?

Spiral or tunnel, poultry or seafood — selection guidance, capacity planning, and refrigerant trade-offs, drawn from 5,000+ installations in 80+ countries.

Capacity Planning

How Freezing Capacity Is Determined

Three factors interact to determine the right freezer size and configuration. Misjudging any one leads to under-performance or over-investment.

  • Freeze Time

    Product thickness, water content, initial temperature, and target core temperature determine required dwell time. Thicker products need longer belt paths or slower belt speeds. Typical range: 8–120 minutes depending on product geometry.

  • Throughput

    Target kg/hr × freeze time = belt loading requirement. A 5,000 kg/hr line with 30-minute freeze time needs 2,500 kg of product on the belt at any moment. Belt width and tier count scale accordingly.

  • Heat Load

    Product heat load (kW) = mass flow × specific heat × temperature drop. This determines evaporator surface area, fan power, and compressor capacity. Under-sizing the refrigeration system is the most common specification error.

Refrigerant Selection

NH₃, CO₂, or HFC (Freon) — The Trade-Offs

Refrigerant choice affects capital cost, operating cost, regulatory compliance, and site safety requirements. No single refrigerant is best for every application.

  • NH₃ (Ammonia)

  • Refrigeration Assembly

  • PU Panel Foaming

Integration Paths

Standalone Freezer or Complete Line?

Three integration models — from freezer-only supply to fully integrated turnkey production lines. Choose based on your in-house engineering capability and project complexity.

  • Freezer Only

    We supply the freezer. Your team handles installation, refrigeration tie-in, and controls integration. Best for experienced operators with in-house engineering.

    • Equipment supply
    • FAT testing
    • Your installation
  • Freezer + Refrigeration

    Complete freezing system: freezer, refrigeration package, controls, and on-site commissioning by our engineers. You handle civil works and utilities.

    • Equipment + refrigeration
    • Our commissioning
    • Your civil works
  • Turnkey Line

    The complete line under one contract — freezing, refrigeration, conveying, and controls, designed and built by Square. Our 200-person crew handles civil, mechanical, and electrical installation through commissioning. One warranty. One handover.

    • Design–build
    • 200-person crew
    • Single warranty
    • Complete handover

Need Help Choosing the Right Freezing System?

Share your product type, hourly capacity, and line layout. Our engineering team will tailor the ideal system configuration—backed by performance data from similar installations.