Engineering Review
Requirements analysis, system matching, configuration proposal
China's No.1 industrial freezing manufacturer. 200-person installation crew deployed worldwide. Spare parts inventory across multiple regions. ≤48h emergency response. One project team from contract to handover.
Project Lifecycle
From the first engineering discussion to years of post-commissioning support — your project stays with the same core team. No handoffs between departments, no dropped context.
Requirements analysis, system matching, configuration proposal
Detailed engineering, manufacturing, factory acceptance testing
Export packing, shipping, customs clearance coordination
On-site construction by our 200-person crew — civil, mechanical, electrical
System start-up, performance verification, operator training
Preventive maintenance, spare parts, remote monitoring, emergency response
Spare Parts
Spare parts inventory maintained across multiple regional hubs. For systems under active service contracts, critical spare parts are pre-positioned based on your equipment configuration.
Every replacement part is manufactured to the same specification as the original. No generic substitutes, no compatibility risks.
Air freight, sea freight, or courier — routed based on urgency. Typical delivery: 3–7 days for in-stock items.
Every system ships with a documented recommended spare parts list — categorized by criticality: 24h / 7-day / 30-day replenishment.
For contracted customers, we pre-stock wear items (belts, bearings, seals, sensors) at the nearest regional hub to your facility.
Siemens PLC standard with HMI touchscreen interface. Real-time monitoring and data logging for:
Support Channels
Two support channels. Both staffed by engineers who understand your specific system configuration — not generic call-center operators.
For production-critical issues: system stoppage, refrigeration failure, control system fault, safety alarm that cannot be cleared remotely.
Engineer responds within 2 hours of call
Remote diagnostics initiated immediately via VPN
If on-site required: engineer or crew dispatched within 24h
Spare parts reserved and prepared for shipment in parallel
Poultry (Cooked)Dedicated WhatsApp / phone line for emergency calls
For non-urgent issues: performance questions, optimization requests, maintenance planning, CIP cycle adjustments, software updates.
VPN-based remote access to your system (with your authorization)
Real-time performance data review by engineering team
Parameter adjustments without on-site visit
Scheduled video-call troubleshooting sessions
Email support with guaranteed 1-business-day response
Training & Knowledge Transfer
Operator and maintenance training delivered on-site during commissioning. Written SOPs, maintenance checklists, and video documentation included as standard.
Hands-on training for shift operators: start-up, shutdown, parameter adjustment, alarm response. Delivered on your production floor with your product.
For your maintenance team: belt replacement, bearing service, CIP operation, sensor calibration, refrigerant leak check. Includes written SOPs.
Key maintenance procedures recorded on video during commissioning. Reference library accessible for refresher training and new hire onboarding.

Tell us the food type, target capacity, and product format. An engineer will recommend the right system configuration — with reference case data from similar installations.